SKRIPSI

Penulis / NIM
PATRIYANTI IGIRISA / 511407075
Program Studi
S1 - TEKNIK SIPIL
Pembimbing 1 / NIDN
ARFAN UTIARAHMAN, S.T., M.T. / 0023087503
Pembimbing 2 / NIDN
KOMANG ARYA UTAMA, S.T., M.Eng / 0022127803
Abstrak
ABSTRACT OPTIMIZATION OF WORK PROJECTS WITH CPM (Case Study: Construction Project of Faculty of Engineering, Gorontalo State University by Patriyanti Igirisa Infrastructure development work at Gorontalo State University is centrally located in Gorontalo. The project is executed by PT.ADHI KARYA (Persero) Tbk.The work takes 150 days. Considering the delayedexecution, it is necessary to accelerate work schedule. It is intended that the project complete on time or even earlier than the planned time, thus the costs can be reduced as small as possible. Acceleration time on the project will certainly affect the costs of execution. In this case, the faster the project is executed, the higher the costs will be. On the contrary,the delay on the project will cause the higher costs. Hence, there is need for an optimization of time and costs. The optimization is obtained from the Crash using Programme Network Planning systems CPM method. The research shows that optimum duration is 12 days or 138 weekdays. Initial execution costs are from Rp. 7.136.060.119,65, to Rp. 7.133.806.119,00. Therefore, CPM methodhas saved Rp. 2,254,000.00. Key words: Optimization, CPM method, Crash Program.
Download berkas

ARSIP

2024
Skripsi tahun 2024
2023
Skripsi tahun 2023
2022
Skripsi tahun 2022
2021
Skripsi tahun 2021
2020
Skripsi tahun 2020
2019
Skripsi tahun 2019
2018
Skripsi tahun 2018
2017
Skripsi tahun 2017
2016
Skripsi tahun 2016
2015
Skripsi tahun 2015
2014
Skripsi tahun 2014
2013
Skripsi tahun 2013
2012
Skripsi tahun 2012
2011
Skripsi tahun 2011