SKRIPSI

Penulis / NIM
JULIANTO HASIM / 511410056
Program Studi
S1 - TEKNIK SIPIL
Pembimbing 1 / NIDN
Dr. ANTON KAHARU, S.T.,M.T. / 0019116808
Pembimbing 2 / NIDN
Dr. MOHAMMAD YUSUF TULOLI, S.T., M.T. / 0004017703
Abstrak
ABSTRAK Julianto Hasim, 2017. Evaluasi Geometrik dan Estimasi Biaya Pembangunan Jalan Baru Ruas Ombulodata-Pontolo di Kabupaten Gorontalo Utara. Skripsi, Program Studi S1 Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo. Pembimbing I Dr. Anton Kharu, ST, M.T. dan Pembimbing II Dr. M. Yusuf Tuloli, S.T, M.T. Kondisi eksisting geometrik jaringan jalan trans Sulawesi pada ruas jalan Ombulodata-Pontolo saat ini memiliki kurang lebih 13 tikungan yang tidak memenuhi alinemen horisontal dan vertikal.Tujuan Penelitian yaitu untuk mengetahui kondisi geometrik pada ruas jalan trans Sulawesi dari Molingkapoto - Pontolo dan jalan baru ruas Ombulodata-Pontolo, serta estimasi biaya yang diperlukan. Metode analisis data yang digunakan adalah Metode kuantitaf digunakan dalam menghitung perencanaan geometrik jalan baik jalan eksisting maupun jalan baru, berdasarkan stanadar geometrik jalan yang berlaku serta perhitungan anggaran biaya pembangunan jaringan jalan baru. Metode kualitatif digunakan dalam analisis untuk membandingkan kesesuaian geometrik jalan antara jaringan jalan eksisting dengan jaringan jalan baru. Adapun hasil analisis kondisi geometrik pada ruas jalan trans Sulawesi dari molingkapoto-Pontolo dengan alinemen horisontal pada 12 tikungan yang tidak memenuhi nilai jari-jari lengkung mininimu dan panajang busur lingkaran untuk jenis tikungan Full Circle dan Spiral-Spiral, untuk jenis tikungan Spiral Circle Spiral masi memennuhi tetapi nilai dari hasil perhitungan tidak sesuai dengan hasil pengukuran langsung pada gambar. Alinemen vertikal yang memenuhi kelandaian maksimum hanya 13 STA dari 58 STA sedangkan 45 STA lainnya telah melebihi kelandaian maksimum yang diijinkan 6%. Kondisi geometrik pada jalan baru ruas Ombulodata-Pontolo untuk alinemen horisontal dengan jenis tikungan Spiral Circle Spiral, nilai jari-jari lengkung 120 meter, dan panjang busur lingkaran 29,2 meter. Alinemen vertikal diketahui nilai kelandain terbesar adalah 5,160 yang tidak melebihi kelandaian maksimum yang diijinkan 6%, dengan estimasi biaya kontruksi sebesar Rp. 9.083.550.000. Kata Kunci : Evaluasi Geometrik, Estimasi Biaya. ABSTRACK JuliantoHasim, 2017. Evaluation of Geometric and New Road Construction Cost Estimation Ombulodata-Pontolo segment in GorontaloUtaraDistrict.Skripsi, S1 Civil Engineering, Faculty of Engineering, Gorontalo State University. Adviser I Dr. Anton Kharu, ST, M.T. and Adviser II Dr. M. Yusuf Tuloli, S.T, M.T. Geometric existing condition of the road network on the trans-Sulawesi roads Ombulodata-Pontolo currently has approximately 13 twists that do not meet the horizontal alignment and vertical.The aims of this research is to determine the geometric conditions on the Trans-Sulawesi road from Molingkapoto - Pontolo and new road segment Ombulodata- Pontolo, as well as the estimated costs necessary. Data analysis method used is quantitative method used to calculate the geometric planning both the existing road and the new road, based on the prevailing geometric standard and budget calculations the cost of building a new road network. Qualitative methods used in the analysis to compare the suitability of geometric way between the existing road network with a new road network. The results of the analysis of the geometrical condition on the road Trans Sulawesi from molingkapoto-Pontolo with alignment horizontally on 12 twists that do not meet the value of the radius of curvature minimum and the length of arc to the type of bend Full Circle and Spiral-Spiral, to kind of bend Spiral Circle Spiral still meet but the value of the calculation results are not in accordance with the measurement results directly on the image. Vertical alignment that meets the maximum only 13 STAof 58 STA, while 45 others have exceeded the maximum allowable slope of 6%. Geometric conditions on the new road segment Ombulodata-Pontolo for horizontal alignment with the type of bend Circle Spiral, the value of the radius arch 120 meters and 29.2meter. Vertical alignment known most flatness value that does not exceed 5.160 maximum allowable slope of 6%, with an estimated construction cost of Rp. 9.08355 billion. Keywords: Geometric Evaluation, Cost Estimation.
Download berkas

ARSIP

2024
Skripsi tahun 2024
2023
Skripsi tahun 2023
2022
Skripsi tahun 2022
2021
Skripsi tahun 2021
2020
Skripsi tahun 2020
2019
Skripsi tahun 2019
2018
Skripsi tahun 2018
2017
Skripsi tahun 2017
2016
Skripsi tahun 2016
2015
Skripsi tahun 2015
2014
Skripsi tahun 2014
2013
Skripsi tahun 2013
2012
Skripsi tahun 2012
2011
Skripsi tahun 2011