ESSAY

Writer / NIM
SURYA LIMONU / 511408067
Study Program
S1 - TEKNIK SIPIL
Advisor 1 / NIDN
KOMANG ARYA UTAMA, S.T., M.Eng / 0022127803
Advisor 2 / NIDN
Ir. RAWIYAH HUSNAN, M.T. / 0027046408
Abstract
ABSTRAK Pada sungai Bolango memiliki banyak bangunan infrastruktur persungaian seperti bendung, jembatan dan infrastruktur lainnya. Sungai ini melewati daerah pemukiman, kota gorontalo dan bermuara di Teluk Gorontalo sehingga dengan mengetahui karakteristik transpor sedimen di bagian hulu, maka akan memberikan kita informasi dan landasan pengambilan kebijakan dalam pengelolaan sedimen di sungai. Metode yang digunakan dalam penelitian ini adalah metode observasi dengan teknik survei. Pengambilan sampel dilakukan pada saat pengamatan dan pengamatan dilakukan pada sungai terhadap besarnya debit aliran dan muatan sedimen pada lokasi pengukuran yang telah ditentukan. Berdasarkan hasil pengukuran didapatkan hasil yang beragam pada tiap segmen pengamatan.Besar transpor sedimen rata - rata hasil pengukuran sedimen melayang (Cs) sungai Bolango di desa Boidu adalah (Qs) sebesar 234,81 ton/hari atau 85.706,06 ton/tahun.Terdapat hubungan yang erat antara konsentrasi sedimen (Cs) dan Debit aliran yang digambarkan melalui persamaan eksponensial dimana terlihat bahwa peningkatan debit aliran mempengaruhi peningkatan Konsentrasi Sedimen yang diperoleh koefisien Korelasi (R2) sebesar 0,97. Kata kunci: sedimen, Bolango. ABSTRACT Bolango river has a lot of infrastructure such as weirs, bridges and other infrastructure. This river passes throught residential areas in Gorontalo city and empties in to the bay of Gorontalo. by knowing the characteristic of sediment transport in the upstream section will provide information and policy making foundation in the management of sediments in the river. The method used in this research is the method of observation with survey techniques. The sampling is taking at the time of the observation made on the river to the amount of flow and separation is done in the river based of current discharge and sediment load at the current measuring location. Based on the various result of measure in each observation segment, the averages of sediment transport (Cs) Bolango river boidu village is 83.492,51 ton/year. There is the closed relation between sediment concentration (Cs) and current discharge. Is described by exponential, it can be concluded that the increasing of current discharge that is gotten by correlation coefficient(R2) 0,97. Key Words: sediment, Bolango.
Download files

ARCHIVES

2024
Year Essay 2024
2023
Year Essay 2023
2022
Year Essay 2022
2021
Year Essay 2021
2020
Year Essay 2020
2019
Year Essay 2019
2018
Year Essay 2018
2017
Year Essay 2017
2016
Year Essay 2016
2015
Year Essay 2015
2014
Year Essay 2014
2013
Year Essay 2013
2012
Year Essay 2012
2011
Year Essay 2011